Uncategorized

Full-Automatic pallet packing line

The pallet will be placed on the in-feed conveyor. The motorized conveyor will transfer the pallet to auto rotary arm wrapping machine,then manually place braces and convey to the second rotary arm wrapping machine for wrapper packing. Then vertical type pallet strapping machine starts to strap pallet automatically. After 90 degree transfer conveyor, start to vertical strapping for the second straps. Then auto

Full-Automatic pallet packing line Read More »

pipe packing line0

steel pipe packing line 3

Operational requirements of steel pipe packing line  Equipment for automation and power supply should be located in special rooms, cabinets near the place of operation of the equipment. Operation, periodic inspection, preventive maintenance and repair of the installation are carried out by qualified service personnel.  Frequency of maintenance (frequency of preventive maintenance and cleaning) – once every 1 week.

steel pipe packing line 3 Read More »

Scroll to Top